Bathroom Fitting: What to Expect, Start to Finish

The Norwich Plumbing Services Team Updated 28 September 2026 5 min read

A new bathroom is a big job. Since planning matters, here's what happens from first survey to final clean.

A bathroom fitting typically takes 3-5 working days. It follows a predictable sequence: survey, strip-out, first-fix plumbing, tiling, second-fix, then finishing and a final clean. Knowing this order in advance makes the process far less stressful. Here’s exactly what to expect at each stage.

Stage 1: Survey and quote

We visit your home, measure up, and talk through what you want. This could be a full refit, a partial update, or just one fixture swap. Whether you’re a homeowner in Wymondham or based in Norwich itself, you’ll get a fixed quote for the whole job. It covers labour, materials, tiling, and waste removal, not a vague estimate that grows once work starts.

Stage 2: Removal (strip-out)

The existing suite, tiles, and any flooring being replaced come out first. This is also when unexpected issues often surface, such as damp, old pipework, or structural surprises behind tiles. A good fitter flags these immediately, with a clear cost impact, because problems are easier to solve early than after the fact.

Stage 3: First-fix plumbing

New pipework goes in for the bath, basin, toilet, and any shower. It’s routed through walls or under the floor as needed. This is the stage where moving a fixture to a new position adds the most time, since that’s more work than a like-for-like swap.

Stage 4: Tiling

Walls and floors get tiled once the first-fix plumbing is confirmed. Any waterproofing, called tanking, goes in first, particularly for wet rooms or shower areas. This is usually the most visually satisfying stage to watch, although it still needs care and precision.

Stage 5: Second-fix

The bath, basin, toilet, taps, and shower are fitted next. They connect to the first-fix pipework already in place. This is when the room starts looking like a finished bathroom, rather than a building site.

Stage 6: Finishing and testing

Sealant, grouting, and final connections go in last. We then test every fixture: taps, flush, shower pressure, and waste flow. A proper snagging check at this stage catches anything that still needs adjusting, before we leave.

How long it actually takes

  • Straightforward refit (same layout, updated fixtures): 3-4 days
  • Full refit with some repositioning: 4-6 days
  • Wet room conversion or structural changes: a week or more

What to prepare beforehand

  • Clear the bathroom of personal items before we start
  • Confirm your final choice of suite and tiles before work begins — mid-job changes cause delays and often extra cost
  • If it’s your only bathroom, plan for alternative washing/toilet access during the work (a nearby gym, a friend, or simply timing showers around the work schedule)
  • Think about storage (a cabinet, shelving) at the planning stage rather than as an afterthought — it’s much easier to build in during first-fix than to retrofit once tiling is done. This applies whether you’re in Norwich or planning a refit in Wymondham

Common things that add time mid-job

Older properties occasionally reveal surprises once the old suite comes out. This can mean damp behind tiles, outdated pipework, or a floor that needs levelling, a real possibility in the older housing stock around Dereham. A good fitter flags these immediately, with a clear cost and time impact, because a proper survey beforehand matters more than a rushed estimate. It catches most issues before work starts, so the quote you receive is realistic, whether the job’s in central Norwich or a period property out towards Dereham.

Cost

Full bathroom fit-outs vary widely by scope, since every job is different. See our plumber prices guide for a general sense of ranges, or get in touch for a proper survey-based quote. If you’re only replacing the toilet rather than a full refit, our toilet replacement cost guide covers that specifically.

We fit bathrooms across Norwich and the surrounding area, from a single fixture swap to a complete refit. This includes jobs out towards Attleborough. Get in touch to arrange a free survey.

All guides

Get a Free Quote

Tell us your postcode and what you need — we'll reply within 1 working day.

Since your privacy matters, we'll only use your details to respond to your enquiry.

Related Guides

Need a Plumber in Norwich?

Get in touch today for a free, no-obligation quote. We cover Norwich and the surrounding area.